Wednesday 10 March 2010

Barracks work update!

Hi everyone, thought I would give you all an update on what's been happening with the Barracks.
Neil and I have been flat out...him more than me, bless him, we don't feel like we have done much but have been at it for weeks.
It is always the way, the preparation takes the longest.
We have most of the damaged boards replaced, just a few more to do....have the insulation ready to put in, the gyprock, hopefully getting started in the next week or so.
They have all been wired, the aircons are in the shearing shed ready to be fitted.
I have bought all the linen, have been checking out beds etc.

Take care,
Marg.

No comments: